EFFECTIVE JUNE 1,
2008,
ALL DISTRICT AREAS
| 1. |
Set up fee for all new or transferred accounts |
$25.00 |
| 2. |
Bad check charge for any check or electronic
paymentreturned by the bank |
$25.00 |
| 3. |
Sanitary sewer tappers license - A
sanitary tappers test is required for all first time tappers
and renewed on a yearly basis |
Initial-$100.00
Renewal-$25.00 |
| 4. |
5/8" Meter for a well user in order
to measure actual sewer flows |
Meter cost + our cost + $50.00
|
| 5. |
Water application fee for all permits issued
in a non-master metered area |
$15.00 |
| 6. |
Outside reader installed by the District |
$50.00 |
| 7. |
Sewer permit fee for a new tap or sewer
repair/reconstruction inspection charge based on 4 hours
of inspection required for the sewer tap or repair
Per hour charge above 4 hours (includes testing)
Overtime inspections charged at one and one-half (1 2) times
the hourly rate |
$275.00
$42.00
$63.00 |
| 8. |
Sanitary sewer abandonment charge for inspection
of sewer connection when abandoned |
$100.00 |
| 9. |
Fire hydrant permit with twelve (12) month
expiration date from date of purchase in the non-master metered
areas (applies to Toledo WL #100 area only) |
$15.00 (WL #100 area) |
| 10. |
Prepaid plan review, inspection
and project administration for commercial/industrial/subdivision
construction for engineering review of each set of plans
for water and sewer construction inspection services upon
plan approval
Charge for each resubmittal of plans
Overtime inspections charged at one and one-half (1 2) times
the hourly rate |
2% of estimated construction costs (due upon plan submittal)
$200.00 for each submittal
$63.00 |
| 11. |
Collection fee for every collection made
on behalf of a private developer based on the Private Developer
Agreement with the District |
$50.00 |
| 12. |
Late payment charge - monthly billing |
$5.00 or 10%
whichever is greater |
| 13. |
Late payment charge - quarterly billing |
$10.00 or 10%
whichever is
greater
|
| 14. |
Plan sheet copy fee-24" X 36" sheet, black & white
24" X 36" sheet, color |
$3.00 per sheet
$6.00 per sheet |
| 15. |
Access card fee for the bulk water station |
$8.00 |
| 16. |
Replacement access card fee for the bulk
water station |
$8.00 |
| 17. |
Water charge for the bulk water stations |
$8.00 per
1000 gallons
|
| 18. |
Water charge for the WaterShed water dispensing units |
$0.25 per gallon |
| 19. |
Copy charge for public records requests
Per the ORC, the District can only charge for the cost of reproduction of documents which does not include employee time.
|
$0.05 per page
$0.07 per color copy/any size
$1.00 per CD-ROM or cassette tape copy. |
| 20. |
Sanitary sewer cross-connection fee-implemented
in situations where known storm and sanitary sewer connections
exist. A thirty (30) day notice will be granted first
in most situations |
$100.00/day |
| 21. |
Map design fee-to generate maps for other entities |
$50.00 per hour |
| 22. |
Plan deposit fee-non-refundable fee paid by contractors for plan sets for projects being publicly bid. |
$100.00 per set |
MASTER METERED AREA FEES
| 1. |
Re-connection fee charged when service has
been disconnected due to non-payment on account or disconnection
due to failure of the customer to comply with the rules and
regulations of the District. |
$30.00 during work hours
$189.00 after hours (3 hours times OT fee of $63.00/hour) |
| 2. |
Trip Charge/Door Notice Charge charged for
trip to post final door notice of shut-off due to non-payment
of account |
$30.00
|
| 3. |
Freezing charge for a residential or
commercial/industrial user for a meter not housed in a meter
pit.
5/8" & 3/4"
1" & 1 2"
2" and
up
Hydrant
Meter |
$ 50.00
$100.00
Time and materials
Time and materials |
| 4. |
Fire-sprinkler-detector meter |
$10.00 minimum charge |
| 5. |
Deposit - temporary hydrant (refunded if
meter not damaged) |
$500.00 |
| 6. |
Hydrant set-up or removal fee permit-includes
accessories (adapter and 50' fo hose and meter)
Set-up fee
Water charge (regardless of provider area)
Short-term rental charge (for pool filling, etc., up to one week of usage)
Long-term rental charge-usage for summer period for hydroseeding, landscape, watering, pond filling, etc. Charges to be billed monthly. |
$100.00
$8.00/gallon per 1000 gallons ($59.84 per 1000 cf)
$100.00 set-up fee plus water cost per 1000 gallons
$100.00 set-up fee plus $50.00 per month rental charge; plus water cost per 1000 gallons |
| 7. |
Fire protection charge for un-metered fire
lines to pay for the availability of water service upon demand
in the event of fire |
$3.00 per inch of pipe and $3.00 per fire hydrant per month |
| 8. |
Unauthorized hydrant use for any person
using a hydrant without the proper authorization |
$100.00 per day + consumption
|
| 9. |
Testing and replacement of meter. Fee
charged if meter is determined to be reading accurately after
testing by the District and/or the manufacturer. If
meter is tested as reading inaccurately, there is no charge |
$100.00 |
| 10. |
Hydrant flow test by request of customer
or insurance companies |
$150.00 per hydrant |
| 11. |
Pool filling quoted on case-by-case basis
by foreman or
superintendent based on pool size |
Case-by-case basis |
| 12. |
Water meter schedule - includes meter
pit, meter, radio read unit, excavation, and a 1" connection
on the water main:
5/8" residential
meter
3/4" residential
meter
Tandem
meter - (2 meters - either 5/8" or 3/4") 1" residential
or light commercial meter |
$1,350.00
$1,350.00
$1,600.00
$1,450.00
|
| 13. |
Large tap schedule - for a 2" tap with a 1" meter, for commercial and industrial inside building
installation. Includes meter, radio read unit, excavation
and the connection on the water main.
For a tap exceeding 2" (3" - 16" tap) on
any size line: District will only perform tap. No
excavation, service line or restoration. Fixed charge is
based on labor of two (2) employees with a four (4) hour
minimum each at the current rate schedule.
Customer is responsible for the installation of the meter
and the service line into the building. |
$2,450.00
Time and materials |
| 14. |
Water taps-all road bores less than 60'
are included in tap fee. Any service line requiring a longer
length of service will be charged at the completion of installation
at $10 per foot over 60' to the permit holder, i.e. 4-lane
highways, wide road right-of-ways, ditch crossings, etc. |
$15 per foot for a road bore in excess of 60 feet. |
| 15. |
Replacement meter cost and MXU cost for
lost meters, damaged meters, well meters, etc.
2" water meter & larger= time+material cost |
5/8"-$160.00+MXU Cost=$334.00
3/4"-$200.00+MXU Cost=$374.00
1"-$275.00+MXU Cost=$449.00
(MXU Cost=$174.00) |
| 16. |
Sewer grinder pump assembly-purchase of a residential single phase unit only |
$4000.00 |
| 17. |
Sanitary sewer pressure system tap fee-cost for District to perform a tap on a sanitary sewer force main (1 1/2" only) |
$1,400.00 |
ALL TAP FEES ARE SHOWN WITHOUT SYSTEM
DEVELOPMENT FEES. FOR A LIST OF THE CURRENT SYSTEM DEVELOPMENT FEES, PLEASE CLICK ON THE FOLLOWING LINK.
adopted: March
9, 1993
amended: February
8, 1994
April
27, 1995
May
2, 1996
March
13, 1997
April 16, 1998
February
11, 1999
April 27, 2000
October 11, 2001
April 10, 2003
April 24, 2003
April 22, 2004
April 28, 2005
March 23, 2006
March 22, 2007
May 1, 2008
|
|